<?xml version="1.0"?>
<records>
  <record>
    <language>eng</language>
    <publisher>Ansari Education and Research Society</publisher>
    <journalTitle>Journal of Ultra Scientist of Physical Sciences</journalTitle>
    <issn/>
    <eissn/>
    <publicationDate>August 2009</publicationDate>
    <volume>21</volume>
    <issue>2</issue>
    <startPage>566</startPage>
    <endPage>570</endPage>
    <doi>jusps-A</doi>
    <publisherRecordId>1224</publisherRecordId>
    <documentType>article</documentType>
    <title language="eng">Optimal flow time in open shop scheduling including weights and transportation time&#xA0;</title>
    <authors>
      <author>
        <name>Indira Vij</name>
        <affiliationId>1</affiliationId>
      </author>
      <author>
        <name>S.K. Mittal</name>
        <affiliationId>2</affiliationId>
      </author>
      <author>
        <name>T.P. Singh</name>
        <affiliationId>3</affiliationId>
      </author>
    </authors>
    <affiliationsList>
      <affiliationName affiliationId="1">Department of S.M.S., Khalsa College, Barara (Ambala) Haryana (INDIA)</affiliationName>
      <affiliationName affiliationId="2">Department of Maths, M.M.P.G., College, Modinagar (UP) INDIA</affiliationName>
      <affiliationName affiliationId="3">Department of Maths, D.A.V., College, Sadhaura (Haryana) INDIA</affiliationName>
    </affiliationsList>
    <abstract language="eng">&lt;p style="text-align: justify;"&gt;The paper deals with n&amp;acute;2 open shop scheduling problem in which the processing time of jobs on machines, transportation time of each job from one machine to another and weightage to jobs is considered. The objective of the study is to find an optimal sequence of jobs which minimizes total weighted mean production time. The algorithm is derived to find out the optimal sequence and is demonstrated with numerical illustration.&lt;/p&gt;&#xD;
</abstract>
    <fullTextUrl format="html">https://www.ultrascientist.org/paper/1224/</fullTextUrl>
    <keywords>
      <keyword language="eng">Open shop</keyword>
    </keywords>
    <keywords>
      <keyword language="eng">make span</keyword>
    </keywords>
    <keywords>
      <keyword language="eng">weighted mean production time etc</keyword>
    </keywords>
  </record>
</records>
