<?xml version="1.0"?>
<records>
  <record>
    <language>eng</language>
    <publisher>Ansari Education and Research Society</publisher>
    <journalTitle>Journal of Ultra Scientist of Physical Sciences</journalTitle>
    <issn/>
    <eissn/>
    <publicationDate>December 2008</publicationDate>
    <volume>20</volume>
    <issue>3</issue>
    <startPage>651</startPage>
    <endPage>658</endPage>
    <doi>jusps-A</doi>
    <publisherRecordId>1426</publisherRecordId>
    <documentType>article</documentType>
    <title language="eng">A model of base stock system for patient customers with lead time distribution undergoing a parametric change</title>
    <authors>
      <author>
        <name>S. Sachithanantham (sachin7676@yhaoo.com)</name>
        <affiliationId>1</affiliationId>
      </author>
      <author>
        <name>V. Ganesan</name>
        <affiliationId>2</affiliationId>
      </author>
      <author>
        <name>R. Sathiyamoorthi</name>
        <affiliationId>3</affiliationId>
      </author>
    </authors>
    <affiliationsList>
      <affiliationName affiliationId="1">Department of statics, St. Joseph College of Arts and Science, Cuddalore - 6007 001 Tamil Nadu (INDIA)</affiliationName>
      <affiliationName affiliationId="2">Department of Statics, Periyar EVR College, Trichi - 620 023, Tamil Nadu (INDIA)</affiliationName>
      <affiliationName affiliationId="3">Former Head, Department of Statics, Annamalai University, Annamalainmagar- 608002 (INDIA)</affiliationName>
    </affiliationsList>
    <abstract language="eng">&lt;p style="text-align: justify;"&gt;Base Stock system for patient customers in inventory control is a special type of problem which introduces the fact that the shortages do not result in the loss of profit due to the fact that immediately a demand for the product is reported; an order is placed for supply. This is in addition to the inventory on hand called the ground level inventory. Hence the socalled base stock denoted as B is equal to the total of the inventory on ground and the inventory on orders placed. In this paper the optimal value of B is obtained using the fact that the lead time is a random variable and it satisfies the so called Setting the Clock Back to Zero (SCBZ) property which amounts to the change in the parameter of the lead time distribution after a change point.&lt;br /&gt;&#xD;
&amp;nbsp;&lt;/p&gt;&#xD;
</abstract>
    <fullTextUrl format="html">https://www.ultrascientist.org/paper/1426/</fullTextUrl>
    <keywords>
      <keyword language="eng">Base stock</keyword>
    </keywords>
    <keywords>
      <keyword language="eng">Patient Customers SCBZ property</keyword>
    </keywords>
    <keywords>
      <keyword language="eng">Change point</keyword>
    </keywords>
    <keywords>
      <keyword language="eng">lead time.</keyword>
    </keywords>
  </record>
</records>
