Optimal flow time in open shop scheduling including weights and transportation time 

Author & Affiliation:
Indira Vij
Department of S.M.S., Khalsa College, Barara (Ambala) Haryana (INDIA)
S.K. Mittal
Department of Maths, M.M.P.G., College, Modinagar (UP) INDIA
T.P. Singh
Department of Maths, D.A.V., College, Sadhaura (Haryana) INDIA
Keyword:
Open shop, make span, weighted mean production time etc
Issue Date:
August 2009
Abstract:

The paper deals with n´2 open shop scheduling problem in which the processing time of jobs on machines, transportation time of each job from one machine to another and weightage to jobs is considered. The objective of the study is to find an optimal sequence of jobs which minimizes total weighted mean production time. The algorithm is derived to find out the optimal sequence and is demonstrated with numerical illustration.

Pages:
566-570
ISSN:
2319-8044 (Online) - 2231-346X (Print)
Source:
DOI:
jusps-A
Share This:
Facebook Twitter Google Plus LinkedIn Reddit

Copy the following to cite this article:

I. Vij; S. Mittal; T. Singh, "Optimal flow time in open shop scheduling including weights and transportation time ", Journal of Ultra Scientist of Physical Sciences, Volume 21, Issue 2, Page Number 566-570, 2018

Copy the following to cite this URL:

I. Vij; S. Mittal; T. Singh, "Optimal flow time in open shop scheduling including weights and transportation time ", Journal of Ultra Scientist of Physical Sciences, Volume 21, Issue 2, Page Number 566-570, 2018

Available from: https://www.ultrascientist.org/paper/1224/

Ansari Education And Research Society
Facebook Google Plus Twitter