Cost benefit analysis of 2-out of 3: G system with correlated failure and repair times

Author:
P. GUPTA and MOHD SHAFI HAJAM
Affiliation:

School of Studies in Statistics, Vikram University, Ujjain- 456010 (INDIA)

Keyword:
Redundant, Stochastic, priority unit, Cold standby, Regenerative point, Bivariate exponential, Reliability, MTSF, Expected uptime, Busy period, Cost benefit analysis
Issue Date:
April 2012
Abstract:

The paper analyses a stochastic model of a cold standby system consisting of three non identical units-A, B and C in which two units are operative at a time. A single repair facility is considered to repair a failed unit. The priority in operation is being given to unit A over to unit B and to unit B over unit C. In case of repair of failed units the priority is just reverse than operation. The failure and repair times of each unit are assumed to follow bivariate exponential distribution. Several measures of system effectiveness are obtained by using regenerative point technique.

Pages:
ISSN:
2319-8044 (Online) - 2231-346X (Print)
Source:
DOI:
Share This:
Facebook Twitter Google Plus LinkedIn Reddit

Copy the following to cite this article:

P. GUPTA and MOHD SHAFI HAJAM, "Cost benefit analysis of 2-out of 3: G system with correlated failure and repair times", Journal of Ultra Scientist of Physical Sciences, Volume 24, Issue 1, Page Number , 2016

Copy the following to cite this URL:

P. GUPTA and MOHD SHAFI HAJAM, "Cost benefit analysis of 2-out of 3: G system with correlated failure and repair times", Journal of Ultra Scientist of Physical Sciences, Volume 24, Issue 1, Page Number , 2016

Available from: https://www.ultrascientist.org/paper/465/

Ansari Education And Research Society
Facebook Google Plus Twitter